Our Project
Current & Ongoing Project
Lorem ipsum dolor sit amet, consectetur adipiscing elit, sed do eiusmod tempor incididunt ut labore et dolore magna.
NOV-TURRET GEOSTATIONARY MODULE
Client : Dyna-Mac Engrg Services Pte Ltd
From : 2021
Until : Ongoing
FPSO Abigail-Joseph
Client : Keppel Shipyard Ltd (Benoi Yard)
From : 2019
Until : Ongoing
GIMI
Client : Keppel Shipyard Ltd (Benoi Yard)
From : 2019
Until : Ongoing
CORAL SOUTH FLNG TURRET
Client : Keppel Shipyard Ltd (Tuas)
From : 2018
Until : Ongoing
Kaombo
Client : Sembcorp Marine Integrated Yard Pte Ltd (Admiralty Yard)
From : 2015
Until : Ongoing
EPC-FPSO-KARISH&TANIN
Client : Sembcorp Marine Integrated Yard Pte Ltd (Admiralty Yard)
From : 2020
Until : Ongoing
TYRA WELLHEADS FABRICATION SUB
Client : Sembcorp Marine Integrated Yard Pte Ltd (Admiralty Yard 2)
From : 2020
Until : Ongoing
EPC-FPSO-KARISH&TANIN
Client : Sembcorp Marine Integrated Yard Pte Ltd (Admiralty Yard 2)
From : 2019
Until : Ongoing
Heerema SSCV Sleipnir
Client : Sembcorp Marine Integrated Yard Pte Ltd (Tanjong Kling Yard)
From : 2016
Until : Ongoing
SHELL-VITO-FPU-NEWBUILD
Client : Sembcorp Marine Integrated Yard Pte Ltd (Tuas Boulevard Yard)
From : 2018
Until : Ongoing
STATOIL JOHAN CASTBERG
Client : Sembcorp Marine Integrated Yard Pte Ltd (Tuas Boulevard Yard)
From : 2018
Until : Ongoing
ARMADA PC MODULES FABRICATION
Client : Sembcorp Marine Integrated Yard Pte Ltd (Tuas Boulevard Yard)
From : 2020
Until : Ongoing
MT ARIAKE
Client : Sembcorp Marine Integrated Yard Pte Ltd (Tuas Boulevard Yard)
From : 2020
Until : Ongoing
SHELL WHALE FPU HULL&TOPSIDES
Client : Sembcorp Marine Integrated Yard Pte Ltd (Tuas Boulevard Yard)
From : 2020
Until : Ongoing
TANTAWAN FPSO
Client : Sembcorp Marine Integrated Yard Pte Ltd (Tuas Boulevard Yard)
From : 2020
Until : Ongoing
MODEC FSO Ailsa
Client : Sembcorp Marine Offshore Platforms Pte Ltd
From : 2015
Until : Ongoing
OMIS Project
Client : Serikandi Oil Field Services Sdn Bhd
From : 2021
Until : Ongoing
Proposed Development of Changi East at ARC and
Client : Yongnam Engineering & Construction (Pte) Ltd
From : 2018
Until : Ongoing
Proposed Development of Intra Airside Road Connection, second parallel Taxiway And Fire Station No. 2 For ChangiEast at Singapore ChangiAirport
Client : Yongnam Engineering & Construction (Pte) Ltd
From : 2020
Until : 2024
Completed Project
2017 – 2021
SOP-2 SHP Steam Piping Repair
Client : Hiap Seng Engineering Ltd
From : 2017
Until : 2017
SOP2 TA17 SHP Steam Header Piping Repair
Client : Hiap Seng Engineering Ltd
From : 2017
Until : 2017
Service Corridor Debottleneck EPC of Pipeline between JAC & EXM
Client : Hiap Seng Engineering Ltd
From : 2018
Until : 2018
Evonik ME6 Project-Package #3 (SE Sub Project)
Client : Hiap Seng Engineering Ltd
From : 2018
Until : 2018
La Noumbi FPSO ex Yombo FPSO
Client : Keppel Shipyard Ltd (Benoi Yard)
From : 2017
Until : 2018
BW GDF SUEZ PARIS FSRU
Client : Keppel Shipyard Ltd (Benoi Yard)
From : 2018
Until : 2019
CRYSTAL SUNRISE -COLLISION DA
Client : Keppel Shipyard Ltd (Benoi Yard)
From : 2018
Until : 2018
P B INGENIUM (SAN JACINTO)
Client : Keppel Shipyard Ltd (Benoi Yard)
From : 2019
Until : 2019
ICHTHYS TURRET PROJECT
Client : Keppel Shipyard Ltd (Tuas)
From : 2014
Until : 2017
MAERSK CULZEAN FSO (TURRET)
Client : Keppel Shipyard Ltd (Tuas)
From : 2017
Until : 2017
FPSO NGUJIMA YIN
Client : Keppel Shipyard Ltd (Tuas)
From : 2017
Until : 2019
CRYSTAL SUNRISE -COLLISION DA
Client : Keppel Shipyard Ltd (Tuas)
From : 2018
Until : 2018
LIZA DESTINY FPSO
Client : Keppel Shipyard Ltd (Tuas)
From : 2018
Until : 2019
LIZA UNITY
Client : Keppel Shipyard Ltd (Tuas)
From : 2019
Until : 2019
LIZA UNITY
Client : Keppel Shipyard Ltd (Tuas)
From : 2020
Until : 2021
PTTEP Bundled Phase 2_Arthit Phase 3C Installation
Client : Nippon Steel Engineering Co., Ltd
From : 2019
Until : 2020
PTTEP AWP-39 Offshore Installation
Client : Nippon Steel Engineering Co., Ltd
From : 2020
Until : 2021
Pulau Bukom Crude Oil Tanks
Client : Rotary-Thai Construction Pte Ltd
From : 2017
Until : 2017
BENCHAMAS FSO
Client : Sembcorp Marine Integrated Yard Pte Ltd (Tuas Boulevard Yard)
From : 2018
Until : 2018
MODEC CULZEAN FSO
Client : Sembcorp Marine Integrated Yard Pte Ltd (Tuas Boulevard Yard)
From : 2018
Until : 2018
SLEIPNIR (NSCV)
Client : Sembcorp Marine Integrated Yard Pte Ltd (Tuas Boulevard Yard)
From : 2018
Until : 2019
TOI JURONG ESPADON-111 #1
Client : Sembcorp Marine Integrated Yard Pte Ltd (Tuas Boulevard Yard)
From : 2018
Until : 2019
Fixed Gangway for T1 At Changi Airport
Client : TTJ Design & Engineering Pte Ltd
From : 2017
Until : 2017
Proposed New Erection of 12 Storey Mixed Development
Client : TTJ Design & Engineering Pte Ltd
From : 2017
Until : 2017
Robinson Tower -Structural Steel Works
Client : Yongnam Engineering & Construction (Pte) Ltd
From : 2017
Until : 2017
Service Corridor Debottleneck EPC of Pipeline between JAC & EXM
Client : Yongnam Engineering & Construction (Pte) Ltd
From : 2017
Until : 2017
N109A -Construction of North-South Corridor (Tunnel) between Sing Ming Avenue and AngMo Kio Avenue
Client : Yongnam Engineering & Construction (Pte) Ltd
From : 2020
Until : 2021
Our Track Records
Lorem ipsum dolor sit amet, consectetur adipiscing elit, sed do eiusmod tempor incididunt ut labore et dolore magna.
3 Types Of Stainless Steel Application Used In The Offshore Industry
Ensuring Quality in Rebar: The Importance of Rebar Geometry Testing
5 Facts To Know About Magnetic Particle Testing
Our Track Records
Seawater Pump Impeller by Consortium led by 3DMetalforge
To check for corrosion and wear resistant material to extend the service life of the impeller
To select parts that suitable to continue in real commercial use after the project.
Impeller will be installed onto a live tugboat for field test of 1 month
Our Track Records
Wecco Connector by Consortium led by Bureau Veritas
Aim to identify parts that can be printed and tested, and with potential to continue creating commercial viability and new processes after the project.
Wecco connector is chosen for quick turnaround
PTSPL & other partners sought to utilize re-engineering to lower the weight of the part and shorten the turnaround time for production
Connectors will be installed onboard POSH’s Anchor Handling Tug by 1H 2022 for trial and testing after the final checks and hydrostatic testing is completed
Our Track Records
Auxiliary Engine Turbocharger Nozzle Ring by Consortium led by Lloyds Register
Aim to print an auxiliary engine turbocharger nozzle ring